MANHOLES AND
INSPECTION CHAMBERS

Hunter Underground Systems

7.01
7.02
7.03
7.04
7.05
7.06
7.07
7.08
7.09
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17

Access to drains
preformed plastic Inspection Chambers
Manholes
450mm diameter inspection chambers
Equal 110mm inspection chamber system
General installation for all Inspection Chambers
250mm inspection chambers
Installation of 250mm inspection chambers
Shallow Access chambers
Hunter chamber bases, using side inlets
Installation of sealed access fittings
Rodent control
Drains within buildings
Non-return valve DS342/DS442
Non-return valve installation notes
Backdrop manholes or tumbling bays
Traditional manhole system
Installation of Channel Fittings

7.00

MANHOLES AND
INSPECTION CHAMBERS

7.01 ACCESS TO DRAINS

Access may be provided by (non-man-entry) inspection chambers or (man-entry) manholes depending on the
depth at which the drain is laid The guiding principle in the location of manholes or inspection chambers is
that they should be so situated as to allow every length of drain to be accessible for maintenance inspection
and removal of debris The layout should, in general, be designed to satisfy the above principle but in the
interests of economy the number of access points should be kept to a minimum. The distance between access
is listed in the Table in section 1.6 “Access to drains”.
In general, manholes or inspection chambers should be provided in the following situations:
1.
2.
3.
4.
5.
6.

At all changes of direction on drains (except for drains where the change in direction is
not too great for cleaning).
At all changes of gradient on drains (except for drains where the change in gradient is
not too great for cleaning).
At all drain junctions where cleaning is not otherwise possible.
On a drain within 12m from a junction between that drain and another drain. unless there
is an inspection chamber situated at that junction.
At the head of each length of drain.
At all changes in pipe diameter.

7.02 PREFORMED PLASTIC INSPECTION CHAMBERS

Inspection Chambers are not large enough for man-entry but allow the drain to be reached from ground level.
Amendments to Part H of the Building Regulations that came into force April 2002 brought it in line with Table
NB.2 of the British Standard for Drains and Sewers Systems Outside Buildings BS EN 752-3: 1997.
Part M of the Scottish Building Regulations was also amended. The table N.B.2 recommends that pre-formed
450mm diameter chamber with 450mm diameter covers are acceptable up to 1.200m in depth and are
known as shallow inspection chambers. This allows Hunter Plastics Ltd’s chamber DS50 to be used with five
risers or with a cut sixth riser, depth are as shown in the chart below.
ASSEMBLY HEIGHT

Base
Base
Base
Base
Base
Base

only
with
with
with
with
with

1
2
3
4
5

riser
riser
riser
riser
riser

DS50

DS66

280mm
444mm
608mm
772mm
936mm
1100mm

360mm
524mm
688mm
852mm
1016mm
1180mm

Hunter’s preformed chambers are for use with PVCu pipe or with clay drainage by using the correct adaptor.
The chamber is capped with a cover and frame (DS62) for pedestrian driveways and pedestrian areas or a
Grade B lid for car parking areas.
DEEP INSPECTION CHAMBERS The amendments allow Building Control officers to accept deeper non-man
entry inspection chambers, to be used on drain and sewers. The deeper pre-formed plastic inspection
chambers will be 450mm diameter but the opening must be restricted to a maximum of 350mm diameter to
prevent people falling down them. This allows them to be used at depths up to three metres for foul or surface
water drainage.

DEEP INSPECTION CHAMBERS CONTPlastic chambers offer considerable time and financial savings in installation as well as significant health and
safety advantages over so-called ‘traditional’ manholes. If the depth allows it both the shallow and deep
inspection chambers are suitable for adoptable or non-adoptable sewers as well as ordinary drainage
applications. All polypropylene inspection chambers are much lighter than the alternative engineering brick,
concrete, vitrified clay or cast iron, making them quicker, easier and, most importantly, much safer to install.
No additional excavation is required and the need for wet trades is eliminated. These chambers can also be
installed by hand, without the use of lifting gear or other machinery and cut to the shaft length required. Once
in-situ, these plastic units will allow for effective rodding, cleaning and CCTV inspection, without compromising
operator safety. Extremely durable and resistant to attack by sulphates in the soil, plastic inspection chambers
will give many years of trouble and maintenance-free service.
7.03 Manholes
The dimensions of manholes given in Table NB3 of BS EN752-3 make allowances for man-entry and are large
enough to allow for rodding and clearance while standing on the benching, and for the operative to carry
breathing apparatus if necessary.
Manholes are normally constructed of brickwork or sectional concrete rings.
BSEN752 should be referred to for other details of construction, step irons and ladders and also access shafts
for deeper manholes.

7.04 450mm DIAMETER INSPECTION CHAMBERS
EQUAL 110mm INSPECTION CHAMBER SYSTEM

The Hunter 450mm diameter chamberbase system consists of an injection moulded chamberbase unit complete
with integral snap caps and seals, lubricated blanking plugs and support feet. On the 110mm (DS50) separate
dry, jointed polypropylene raising pieces are used in conjunction with a frame and cover (DS62).
The 160mm chamberbase (DS66) requires the inclusion of a ring seal (DS67) between the base and 1st riser
only, subseqauent risers are dry joint assembly.
The base units are 450mm in diameter and have an effective height of 278mm(110mm) and 360mm (160mm).
They conform fully with all current building regulations and BSEN 752 (Table NB2).
Base units are supplied with lubricated blanking plugs. These may be pushed out on site when required and used
to secure unused inlets
When making joints, the pipe spigot must be well chamfered, de-burred, cleaned and lubricated using Hunter
lubricant.
The pipe is then pushed into the socket allowing a clearing for subsequent expansion ie., pipes should be pushed
home fully and then withdrawn by 10mm.
The top riser may be cut using the strengthening ribs for guidance to the required level.

7.05 General installation for all Inspection Chambers
All inspection chambers must be installed in accordance with the following instructions.
Bedding Procedure
Where a Grade A cover is to be used, the chamber base should be bedded with the invert to line and level, on a 100mm depth
of 10mm nominal, single-sized aggregate having no sharp edges. Alternatively, granular material in accordance with the
recommendations of Appendix A, may be used, but having a particle size not exceeding that specified in Table 1 for a 110mm
diameter PVCu pipe. If a Grade B cover is used, the chamber should be surrounded in concrete (see Figure 2 below).
The 450mm inspection chambers may be used in conjunction with a Grade A or Grade B cover depending on the application.
Note1: Inspection chamber covers Class A15 should be used in areas which can only be accessed by pedestrians and pedal
cyclists. Class B125 covers are for footways, pedestrian areas and comparable areas, car parks or car parking decks.
Where the Hunter cover (DS62) is used, the cover and frame is to be supported on a concrete base while the chamber is
surrounded by granular backfill as recommended by Appendix A. (See section 5.09 Bedding and Backfilling). When a Grade B
cover is to be used, the chamber should be fully supported in a concrete surround.
Figure 1

Figure 2

Polypropylene lockable cover & frame 3.5 tonnes wheel load suits
pedestrian areas/domestic driveways. Complies with Building Regs Part H.

EN124 CLASS B125 cover (supplied by others)

7.06 250mm INSPECTION CHAMBERS

The injection moulded 250mm diameter inspection chambers allow access to drains within close proximity
to any building. They can accept up to three connections and be used at depths of up to 600mm.
The base comes complete with two lubricated blanking plugs {DS56) to secure unused inlets which can be
pushed out as required on site, eliminating the need for fabrication or use of adhesive.
Two 45˚ swept inlets allow for efficient flow into the 110mm main channel.
The base unit is 250mm in diameter, has an effective height of 189mm and fully conforms with all current
building regulations and BSEN 752.
CONFIGURATION

INVERT HEIGHT (mm)

Base only

189

Base with one riser

394

Base with two risers

600

*

*

Complete with PVCu sealed frame and cover (DS69)

The top riser may be cut using the strengthening ribs for guidance to the required level.
The 250mm units may be used with a circular aluminium (DS39) or PVCu (DS69) cover and frame or
square top frame and cover (DS68).
The (DS69) PVCu cover and frame incorporates a sealing ring and screwdown cover to achieve an
airtight fit. This is a requirement in the building regulations for inspection chambers situated within
buildings. However the robust black PVCu frame and cover is also ideally suited for external use.
A sealing ring (DS40) may be purchased separately and used in conjunction with DS39 to form an
airtight cover.

7.07 INSTALLATION OF 250mm INSPECTION CHAMBERS
General

The chambers must be installed in accordance with Hunters instructions.
Procedure

1. Where a Grade A cover is used, the chambers should be bedded with the invert to line and level, on a
50mm layer of 10mm nominal, single-sized aggregate having no sharp edges. Alternatively, 100mm depth
of granular material in accordance with the recommendations of Appendix A may be used, but having a
particle size not exceeding that specified in Table 1 for a 110mm diameter PVCu pipe. If a Grade B cover is
use the chamber should be surrounded in concrete.
2. When making the joints the pipe spigot must be well chamfered, de-burred, cleaned and lubricated using the
recommended lubricant. The pipe is then pushed into the socket seal allowing a clearance for subsequent
expansion, ie the pipes should be pushed home fully and then withdrawn by 10mm.
3. Where a Grade A cover is used, backfilling is carried out using suitable granular material as described in
(Appendix A* or Table 1) up to a level of 100mm above the crown of the inlet and outlet pipes, and is
continued in well compacted layers not more than 300m deep. Care must be taken to avoid excessive
deformation of the chamber wall.
4. During backfilling, the chambers should be covered to prevent ingress of foreign matter into the drain.
5 It is important that when a Grade B cover is used the chambers must be protected from heavy loads by an
adequate concrete bedding and surround. The correct methods for bedding a Grade B is shown in the
bedding procedure for 450mm chambers.
6. If the chamber is to be installed in ground where the water table may rise e above the invert level of the
chamber the chamber must be bedded on and surrounded by concrete in a similar manner to installation
where Grade B cover is used.
7. Precautions must be taken to protect the chamber from damage by construction site traffic.
8. During backfilling, the cover and frame should be placed in position to prevent ingress of foreign matter into the
drain and excessive deflection of the chamber walls.
9. A concrete collar is placed to secure the frame (See diagram below).

DS69

DS72

Ground level

Concrete
collar

Earth
Granular
backfill

110mm Drain

DS71

7.08 SHALLOW ACCESS CHAMBERS

BSEN752 states that “where a branch drain joins a main pipe without an inspection chamber or manhole at
the junction, access should be provided on the branch within 12 metres of the junction”. Therefore, by using
the Hunter Shallow Access Chamber, the need for inspection chambers at the junction of the main sewer is
minimised. All standard rodding equipment may be used with the Hunter Shallow Access Chamber.

SVP

SVP

Back inlet gully

Back inlet gully

Shallow access chamber
Hunter
inspection
chamber

Main drain or sewer

EXAMPLE: showing left hand shallow access chamber application

SVP

SVP

Back inlet gully

Shallow access chamber

12m max
Main drain or sewer

EXAMPLE: showing double shallow access chamber application

Back Inlet Gully

Back Inlet Gully

Shallow
access
chamber
Main drain or sewer

EXAMPLE: showing right hand shallow access chamber application

7.09 HUNTER CHAMBER BASES, USING SIDE INLETS
It has been found that inappropriate use of the side connections on the inspection chamber base has led to blockages occurring.
Notably this occurs when only one side inlet is used at the head of the drain and/or the gradient of the pipe into the chamber is
excessive. Without any other flow through the chamber the solids are deposited on the opposite side of the channel and cannot be
washed away. See Figure 1.
Figure 1

This problem will not occur if the flow is guided through the main channel by using 45˚ spigot tail bends on the inlet and outlet. See figure 2.
Figure 2

Changes of direction should be accessible in case a blockage occurs, therefore bends should be sited immediately on the inlet or outlet
or a manhole or an inspection chamber. However an angle of not more than 45˚ should be used so that the flow is not impeded or
access for CCTV is restricted. See the example in figure 3.
Figure 3

N.B. 450 x 110mm system depicted

7.10 INSTALLATION OF SEALED ACCESS FITTINGS
Manholes with Sealed Access Fittings are generally
constructed in the same way as traditional manholes but as
watertightness is not critical, unlined brick or concrete
manholes may be permitted. Benching of the pipework is
essential.
1.

Bed all Sealed Access Fittings in cement mortar on a
suitable concrete base.

2.

Make pipe connections in the same way as the
standard Push-fit jointing of fittings.

3.

Allow pipe ends to protrude beyond the edge of the
manhole base so that connections can be made after
the manhole walIs have been built.

4.

Slope benching of the pipework so that standing water
will drain into the Access Fitting when the cover is
unscrewed. The benching must provide adequate
clearance for the access cover to be removed, for
routine servicing. Undue force should not be used
during the tightening process.

5.

Where standpipes are specified, fit these to the boss
socket on the side of an Access Pipe DS309 or DS472.

6.

Use Sealed Access Fittings inside buildings in manholes
with single seal manhole covers and for installations of
suspended basement drainage.

The details below shows the construction of a manhole at the
junction of two branch drains into one, using access junctions.
In this detail the manhole is shown constructed from concrete
sections, as it is not necessary to construct watertight
manholes owing to the use of Hunter sealed access fittings.

Concrete infill surround pipe
and fittings over crown of
pipe with gaps around access
caps

Concrete omitted
for clarity

Access junctions DS680 LH and DS681
RH with DS331 Bends if required.

Water level

Diagram showing standpipe in a manhole for detecting within the system

7.10 INSTALLATION OF SEALED ACCESS FITTINGS CONT-

The necessity for waterproof manholes is obviated when using Hunter sealed drainage systems. The detail
below shows the recommended methods for dealing with ingress of water in the base of manhole chambers.
It should be noted that this arrangement will only be necessary for use on very damp soil or any situation
incurring a high water table or where the manhole is likely to act as a catch-pit for surface water.

ELEVATION
PLAN
Push-fit joint to enable
stand plug to be removed

access branch

concrete section manhole

7.11 RODENT CONTROL

Along with Non-Return Valves (See section 8.14) sealed drainage systems can be used where special
measures are required to control rodents. However, they should only be used in shallow inspection chambers
where maintenance can be carried out from the ground level.

7.12 DRAINS WITHIN BUILDINGS
Drains should be laid external to the building wherever possible, however, branch drains from internal appliances and soil stacks make some
drain pipe under building inevitable. For larger buildings the options to consider are drainage suspended at high level or in an underfloor
duct , or drains lain in the ground under the lowest floor. When a drain route passes through or under a building structure, it is imperative to
consider the effects of differential settlement between the structure and the drain. Consequently Hunter Plastics Limited had manufactured a
long radius rest bend with a triple expansion socket to cope with this problem (DS664). See the diagrams below.
It might be difficult to provide external overflow point, such as open gullies to warn of a blockage with the internal drainage system. Therefore,
to prevent surcharging causing flooding of the building the designer may with to consider the use of Hunter’s Non-Return Valves in 110mm
(DS342) or 160mm diameter (DS442). See the diagram in section 8.14.
Where it is not possible, to contain any surcharging of the drainage Hunter Plastics Limited manufacture a range of screw cap type access
fittings that can be incorporated into the pipe system. The range of products for suspended pipes will be found in our above ground soil pipe
system. Access fittings used within the underground drainage are fitted into a manhole. See the diagrams and text below. To tell how far within
the building the drainage is blocked, standpipes with an access cap can be fitted at each manhole. See section 8.11. Effluent in the
standpipe warns of a blockage, therefore the manholes down the line have to be inspected to find a clear manhole from which to rod the
system and remove the debris. See the diagram below in section 8.11.
For domestic properties Hunter’s shallow inspection chambers with a sealed cover, such as the DS69 or DS39 with sealing ring DS40, can be
used instead, but the depth from cover to invert must not exceed 600 millimetres. See details in section 8.08 250mm Inspection Chamber.

Dimensions

Long Radius Bend - Code No. DS664 (110mm

)

110mm

• The long radius bend is manufactured in PVCu and complies with
requirements as laid down in BS EN 1401
210mm

• The radius of the bend meets with the recommendation as specified in BS EN12056
200mm minimum at the base of soil stack.

450mm

• Incorporates a support leg at base of bend for ease of installation.
• Where ground conditions are such that settlement could occur, then the specially designed
triple expansion socket can accommodate up to 150mm movement.
55mm
254mm

S254
WC bend

Fixed point

DS47 Access plate
Access pipe
DS269
871⁄2˚ branch
DS671
871⁄2˚bend

S210
Solvent weld
double socket

Solvent
weld joint
DS664
Rest bend with
triple expansion
socket

DS664
Rest bend with
triple expansion
socket

GROUND FLOOR CONNECTION TO WC

EXTERNAL SOIL STACK

7.13 NON-RETURN VALVE DS342/DS442
In accordance with Approved Document H1 of the Building Regulations and British Standards 8301: 1985, where a drain is liable to
surcharge, measures should be taken to protect any building and ancillary area likely to be adversely affected. The measures necessary to
protect a drainage system or building from surcharge should be as simple a possible and be so arranged as to have minimal effect on the
drainage system.
Hunter’s Non-return valve is a simple, effective way to eliminate flood risk caused by back-flow through drainage channels.
The integral flap valve is the simplest design and when installed within the drain run the valve offers the most effective means of preventing
flood damage.
Made from tough, anti-corrosion PVCu in 110mm and 160mm sizes.
SUITABLE FOR:


Low lying coastal, lake or valley areas where a drainage system is laid to shallow depths or with flat gradients



Where the building level is below the upper level of the main sewer



Low lying coastal, lake or valley areas where a drainage system is laid to shallow depths or with flat gradients



Where rainwater is channelled into the main sewer, making it liable to flooding during heavy rainfall



Commercial and industrial applications where non-pressure flow control is required, for example, fish farming



To reduce rodent ingress

Note: recommended for installation within an access point for regular inspection maintenance and cleaning
Applications confined to surface and clean water systems only.

(See installation notes on next page).

7.13 NON-RETURN VALVE DS342/DS442 CONTB

C
D
Ø

A

Dimensions (mm)

Ø

A

B

C

D

DS342

110

61

270

215

190

DS442

160

74

334

256

230

Note: The top of the valve is removable to aid cleaning and maintenance. The bolts use to secure the valve top can be removed
using a 13mm socket or open-ended spanner.

150mm minimum concrete around
top of the shaft to provide bed for
frame

Suitable cover and frame (Hunter
DS62 cast iron cover and frame,
Class ‘C’)

When using Class ‘C’ cover and
frames the chamber should be
supported by a granular backfill as
recommended by Appendix A. of
BS 5955: Part 6.
When using Class 'B'” cover and
frames the chamber should be fully
supported with a concrete surround

DS58 Raising pieces to form
chamber shaft. (up to 1 metre
invert depth)

DS211 Double couplings used
to form rocker pipe

Concrete rings or brick built
shafts to be used over 1
metre depth

Raising pieces joined to
concrete bed

Direction
of flow

DS211

Concrete base and valve surround
The valve should be installed within the drainage run and must be horizontal. This ensures that the
flap opens under normal flow conditions and positively shuts off under surcharging conditions

7.14 NON-RETURN VALVE INSTALLATION NOTES
Install the non-return valve into its own chamber to make
periodical inspection easier. Ensure that it is installed
the right way round (socket upstream)

Install the value longitudinally to the pipe, the maximum
slope should not be more than two degrees (fall 1:27)

MAX 2˚

To ensure perfect operation of the valve it must be
perpendicular (see drawing).

In order to periodically inspect the valve, rotate the
handle toward the position ‘closed’. In case of
resistance to the rotation, remove the cover and clean
the inside of the valve. Leave the handle in the open
position under normal working conditions.

If the valve is positioned downstream of the soil pipe,
the valve must be inspected frequently. Gradually
tighten the bolts in the order shown 1 - 2 - 3 - 4.



CLOSED

OPEN









7.15 BACKDROP MANHOLES OR TUMBLING BAYS

These are designed to accommodate significant differences between invert levels by building a manhole on
the lower drain and providing a vertical or nearly vertical drop-pipe from the higher drain.
A drop-pipe on a branch drain should terminate at its lower end with a bend turned so as to discharge its
flow at 45˚ or less to the direction of flow in the lower drain.
Where the difference in invert levels is less than 1.8m, a ramp may be formed by increasing the gradient of
the last length of the upper drain to about 45˚.

External Backdrop

Internal Backdrop

Access Gap
DS246

DS667

DS672
DS672

Channel
bend

Channel
bend

DS559

DS559
DS671

DS47
Ramped Rodding Point
45˚ Bend
DS331

45˚ Branch
DS678

suitable back
fill material
110mm pipe
to suit length

45˚ Branch DS331 or DS676

7.16 TRADITIONAL MANHOLE SYSTEM
Tables showing the minimum dimensions of manholes are found in The Building Regulations Approved Document H1 and
BSEN 752 Part 3. They can be of any depth, consequently their size allows personnel to work within the chamber at drain level.
Manholes are constructed from precast concrete risers of engineering bricks supported on a concrete base and enclosed with a
frame and cover. BSEN 752-3 states that ‘Where practical the channel should be the same material as the drain or sewer’,
therefore Hunter Plastics has produced a range of 45˚ and 871⁄2˚ channel bends plus a straight through and 871⁄2˚ long radius
channel pipe. The 871⁄2˚ channel bends need to be cut on site to suit the angle of entry; therefore, we have produced a product
selector guide on the following page. The various angles shown are obtained by cutting with a fine toothed saw through the
spigot end of the bend when laid in position on the channel pipe.
After assembly the whole installation needs to be benched, therefore, the external surfaces of the 45˚ and 871⁄2˚ channel bends
are coated with a black graphite paint to give a key for the cement mortar benching. To key the PVCu pipe to accept the
benching, roughen it with sandpaper or emery cloth, clean with solvent cleaner and coat it with solvent cement. While still wet it
should be sprinkled with clean dry sand and allow to dry.
In case of settlement, rocker pipes should be fitted to pipe outside of the chamber.
For full details of manhole construction reaction NB.4 of BSEN 752-3: 1997.
Using chamber bases with manholes
Hunter chamber bases are designed for use with the preformed raising pieces to form inspection chambers, however they
could be used within deeper manholes as long as the chamber width was sufficient to provide a stable footing for workers at
the base level. Section NB.4 and table NB2 of BSEN 752-3: 1997 should be referred to for further details. Please find here a
diagram showing a possible application of the DS50 chamber bases.

Pre-cast concrete rings

DS211

At the point where the pipe is
built into the concrete bed a
flexible joint must be installed
within 150mm of its face and
connected to a rocker pipe.

DS50

DS211

Concrete bed and surround
Bed Min. 200mm to invert

7.17 INSTALLATION OF CHANNEL FITTINGS

1.

Bed all round channel pipe and channel fittings
in cement mortar on a suitable concrete base.

2.

Side entries into the main channel should have
an angle of entry not greater than 90˚ at the
internal face of the inspection chamber or
manhole. For entries greater than 90˚ bend
should be placed adjacent to the manhole,
which should provide a deviation of not more
than 45˚.

Manholes in traditional style, using open channels

Traditional
brick built
manhole
with PVCu
channel
pipes and
bend

Benching
omitted for
clarity
Line of
haunching
and benching

The Hunter range offers a number of 3/4
sectional bends which can be cut on site to suit
angles of entry into any inspection chamber or
manhole of between 30˚ and 90˚ .
3.

4.

Bed the bends in cement mortar and connect
them to the main channel so that the discharge
from the branch is in the direction of flow of the
main channel.
Allow pipe or fitting ends to protrude beyond
the edge of the manhole base so that
connections can be made after the manhole
walls have been built.

5.

Provide concrete benching to rise vertically from
the top edge of the channel pipe to at least the
height of the outlet soffit.

6.

Shape the benchings round the channel bends
of the branch drains to guide the flow of
sewage into the desired direction.

7.

Where practicable ensure the soffits of the main
pipes entering and leaving a manhole maintains
a similar gradient.

Benching
omitted for
clarity

110mm
channel
pipe

Channel
bend 871⁄2˚
DS568
Channel
bend 45˚
DS561

Cut to suit
site
conditions

Channel
bend 871⁄2˚
DS567

110mm

This detail shows one alternative for running branch drains
into a manhole via a 3/4 section short radius channel bend

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close