POWER AND WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
ISO 9001 : 2008 2008
ITEM No. No.
PLANT LOCATION LOCATION
Yanbu Industrial City, KSA
PROJECT CONTRACT NUMBER/TITLE
CONTRACT NO. 7200 012 306 - INSTALLATION OF 48,000m3/day WASTE WASTE TREATMENT PLANT (IWTP-II) AT MARAFIQ - YANBU YANBU
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION INSTALLATION
Rev No: A
DOC.NO: 12306-ME-A4-270 1 2306-ME-A4-2702 2
DATE: 20-02-2012 20-02-2012
Inspection & Testing Description
Acceptance Accepta nce Criteria
Reference Document Document
QCChecklist
AKWAN
Q
M.E
MFQ
QCF-001
P
W
S
S
QCF - 113
P
W
S
S
QCF - 115 QCF - 116
P
W
S
S
Remarks
MATERIAL INSPECTION Drawing,Manufacturer RC Standard 15820/15670,Material Instruction, Approved Material Approval equipment,duct & accessories,hanger/supports, Insullation, air terminal devices,Flexible Connection, submittal,Drawing,Relav Submittal,Purchase
Equipment/Material Receiving inspection for HVAC 1
3.1).Duct Material conforming to specification. 3.2).Duct Layout and Elevation. 3.3).Duct Installa ation tion as per approved drawings. 3.4)Hangers and support installation support spacing,ducting route,reinforcement & hangers. 3.5)Check joints & Application of duct Sealant. 3.6). Visual check of connection tightness. gaskets & seals. 3.7)Visual Inspection of duct & its accessories conforming to the project. 3.8).Check accessories & duct free from damage.
Manufacturer recommendation,HVAC Duct construction standards,SMACNA, Project specification, Drawing.
3.9).Duct Insulation material are conforming to the project specification. 3.10).Duct insulation installation as per drawing, check the insulation band spacing as per drawing.
Page 1 of 5
ITEM No. No.
4
INSTALLATION ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION INSTALLATION
Rev No: A
DOC.NO: 12306-ME-A4-2702 12306-ME-A4-2702
DATE: 20-02-2012 20-02-2012
Inspection & Testing Description
AcceptanceCriteria
Reference Document Document
QC Checklist
Remarks
AKWAN
Q
M.E
MFQ MFQ
W
W
S
DUCT IN INSULATION SULATION / CLADDING
8
8.1) Material Thickenss, Approved Insulations / Cladding Sheet. 8.2) Material Delivered at Site is free from Defects & as per specifications. 8.3) Check duct Surface for Clean & dry prior to Insulations. 8.4) Size of fastening Screws. 8.5) workmanship. 8.6) Check sealant. 8.7) Correct flow direction. 8.8) Check all the joints are sealed properly. 8.9) Visual Inspection of conditions of air cutlets & inlets & dirction of grills.
RC Standard 15820/15670,Project specification, drawing,QCP Relavant applicable code & stand M ua far d ctsu,rer instructions manual. instructions
SMACNA HVAC Duct construction Standard,Purchase Order,Manufacturer
QCF-120
P
Recommendation.
LEAK TEST INSPECTION
9
Check for Leak Test for Duct Installation, by conducting light test Method
EQUIPMENT INSTALLATION
RC Standard 15820 / 15670,QCP ,Project specification,Relavant Vendor applicable recommendation,SMAC codes/standards NA Standards, RC Manufacturer Instruction Standard.
QCF-119
P
W
W
S
S
S
manual.
Equipment Foundation Location Check as per RC Standard Approved Drawing. Drawing. 15820/15730,QCP 10.1) Verify unit Installation is as per approved Project specification,Relavant Drawing, Check Vibration pad Place Beneath Approved Drawing. 10 the Package Equipment installation. applicable Industrial 10.2) Check Orientation & Level is per IFC codes/standards Drawing. C) Check Condensate Drain System Manufacturer Installation manual. is as per approved drawing.