INSPECTION & TEST PLAN

ITP DESCREPTION: PASSIVE FIRE PROTECTION APPLICATION
PROJECT: WHEATSTONE PROJECT LNG PLANT - MODULE FABRICATION YARD
CLIENT: BECHTEL OG&C, BECHTEL INTERNATIONAL INC.
ACTIVITY DESCRPTION
NO
1
Pre Start Activites
1.1
1.2
2

Review client repair procedure to PFP application
Develop Inspection and Test Plan
Material

2.1

Manufacturer Test certificate

2.2

Check Storage temperature of Chartek 7

2.4

Check Valid Shelf Life and Batch Nubmers

3

ITP NO:

CONTRACT NO:2567-140-HC3-YB00-000

APPLICABLE PROCEDURE

ACCEPTENCE CRITERIA METHOD OF VERIFICATION (See Legend)
DOCUMENT
RML
KHL
BEC

Fire Proofing Repair Procedure

RML/PFP/REP/001

R

R

R

RML/PFP/REP/001

R

R

R

R

R

R

H

H

W

H

H

W

H

H

W

Coating Specfication for
Chartek 7

H

H

W

PFP Manufacturer Test certificate
RML/PFP/REP/001
PFP Manufacturer Test certificate

Inspection Measurement and Test Equipments
Calibration Certificate
Calibration Certificate

3.1
4

Verifing Measuring devices such as
Hygrometer,Steel Temprature and Dft Gauge
Pre Appication Activity

4.1

Verify Damaged coats condition

Coating Specfication for

4.2

Check Steel Temperature,Dew Point & RH

Fire Proofing Repair Procedure

RML/PFP/REP/001

H

H

W

4.3
5

Masking and Covering of Non- PFP areas
PFP Application

Fire Proofing Repair Procedure

RML/PFP/REP/001

H

H

W

5.1

Check Appropirate Equipment for PFP
application and Monitor the Application

Fire Proofing Repair Procedure

RML/PFP/REP/001

H

H

W

Chartek 7

5.2

Ratio Checks

Fire Proofing Repair Procedure
RML/PFP/REP/001
INSPECTION & TEST PLAN
ITP DESCREPTION: PASSIVE FIRE PROTECTION APPLICATION
PROJECT: WHEATSTONE PROJECT LNG PLANT - MODULE FABRICATION YARD
CLIENT: BECHTEL OG&C, BECGTEL INTERNATIONAL INC.

ACTIVITY DESCRPTION
NO
5.3
Meshing

APPLICABLE PROCEDURE
Fire Proofing Repair Procedure

H

H

W

ITP NO:
CONTRACT NO:2567-140-HC3-YB00

ACCEPTENCE CRITERIA METHOD OF VERIFICATION (See Legend)
DOCUMENT
RML
KHL
BEC
RML/PFP/REP/001
H
H
W

CheckRepair are carried out in accordence
5.4
Chartek Repair Procedure
Fire Proofing Repair Procedure
RML/PFP/REP/001
H
H
W
Legend: R-Review, H-Mandatory Hold Point for Inspecction, S- Survelliance
Note: Any/chandes on the ITP due to new Revision of Specfic
limited to that particular activity. Previsouly approved metho
Other activities remain Unaffected.
RM LEOPAD QC Date & Signature

KENCANA Petroleum QC Date & Signature

BECHTEL QC Date & Signature

CHERVON QC

40-HC3-YB00-000

ON (See Legend)

VERIFYING DOC

CHERVON

R
R
R
S

VES/PFP/1ST/001

S

VES/PFP/1ST/001

S

S

VES/PFP/1ST/001

S

VES/PFP/1ST/001

S

VES/PFP/1ST/001

S

VES/PFP/1ST/001

S

VES/PFP/1ST/001

140-HC3-YB00-

ON (See Legend)

CHERVON
S

VERIFYING DOC
VES/PFP/1ST/001

S
VES/PFP/1ST/001
sion of Specfications, Shall Be
pproved method of Verification on

CHERVON QC Date & Signature

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close