CONSTRUCTION - TAMAPOLE SHORE BASE PROJECT PT.BOURBON LOGISTIC INDONESIA

TS-A-021 SANITARY

1.

SCOPE OF WORK. This includes the provision of materials, labor, equipment and installation aids Sanitair as shown in shop drawing.

2.

STANDARS / REFERENCES 2.1 Manufacturer standard Pipe PVC standar SNI 06-0084-20002 wiht high presure class 10kg/cm2 Specifications: 2.2.1 Installing a PVC water pipe This subject directed in the mechanical specification.

2.2

3.

GENERAL PROCEDURES 3.1 Samples of Technical Data Samples of technical data shall be submitted owner / engineer for approval first. Detail Drawing The contractor must make and submit a detail drawing implementation to engineer for review and approval. Detail drawing need to be made based on the implementation of existing measures at work site (at which these materials will be installed) and adjusted to the conditions in shop drawing. Shipping and Storage All imported goods must be equipped with manufacturer brands and technical data, and should be kept in a secure and protected so that avoided the defects and unwanted damage.

3.2

3.3

4.

INSTALLATION 4.1 General Before the materials for the equipment brought to the work location. The contractor shall give / show examples to the Field Supervisor for approval. Installation Installation of closet must be in the foundation that has a strong base and strong. Color toilet will be determined later by owner / engineer.

4.2

68

Doc No. Revision Date

: TS-A-021 :1 : Mei, 25th 2010

CONSTRUCTION - TAMAPOLE SHORE BASE PROJECT PT.BOURBON LOGISTIC INDONESIA

-

Floor drain used must be made of durable materials and can be opened for cleaning. Making Septictank and air pipe adapted to land conditions and according to instructions from the Board of Directors. Installing the dirty water using PVC pipe in accordance with the size of the image. Installation of pipes dirty water installations should really consider its slope. The connection pipes have to be really perfect that no leak at the connection. After all piping systems installed fully completed, must be witnessed testing of Directors. If there are leaks, then the Contractor shall repair to the well and ensure the installation of the pipe does not happen anymore leaks. Before testing carried out, the pipeline system must be in first flushing to re move impurities that may exist in the system.

-

-

-

-

-

-

Before the delivery of work, Contractor shall perform testing all the way properly working system, and if any damage should be repaired / corrected, then the experiment is done once again until the system can be operated in a normal

5.

SANITARY USING IN BUILDINGS Table 21.1 Sanitary using in building No. 1. 2. 3. 4. 5. 6. BUILDING GUEST HOUSE VVIP GUEST HOUSE VIP GENERAL MANAGER MANAGER SUPER INTENDENT SUPERVISIOR USED gutter gutter gutter gutter gutter gutter

69

Doc No. Revision Date

: TS-A-021 :1 : Mei, 25th 2010

Sponsor Documents

Or use your account on DocShare.tips

Hide

Forgot your password?

Or register your new account on DocShare.tips

Hide

Lost your password? Please enter your email address. You will receive a link to create a new password.

Back to log-in

Close